Main Contractor: MACE
Site: UCLH
Project Brief: Basement Digging and general materials movement.
The long reach excavator has now left site but there is still many truckloads of waste materials to be removed from the basement, pile caps and other waste concrete along with various clays and sands excavated across the site still have to be removed from site.
After great success in the Leicester square project, Mc Gee’s chose again to use the Gecko Truckloader as the award winning number 1 system to remove the remaining spoil from site.
The versatility of this skip is unrivalled in Safety, Efficiency and Cleanliness. Trucks are filled quietly and quickly to capacity with no spillage.
If you would like to know more about our efficient TRUCKLOADER system contact us now!