Main Contractor: Thames Tideway

Project Brief: Back Filling Excavation

Skip Chosen to Fulfill The Task: Billy

TRUCK LOADER JETHRO – BACK FILLING WITH EASE.

*** A GECKO RADIO CONTROLLED  TRUCKLOADER SKIP ***   Backfilling Tideway West Carnwath Rd.  Shifting 18t of  spoil at a time.

No temporary works or set up time required, no operators in the discharge zone. 

If you would like to know more about our efficient TRUCKLOADER system contact us now!