Main Contractor: Thames Tideway
Project Brief: Back Filling Excavation
Skip Chosen to Fulfill The Task: Billy
TRUCK LOADER JETHRO – BACK FILLING WITH EASE.
*** A GECKO RADIO CONTROLLED TRUCKLOADER SKIP *** Backfilling Tideway West Carnwath Rd. Shifting 18t of spoil at a time.
No temporary works or set up time required, no operators in the discharge zone.
If you would like to know more about our efficient TRUCKLOADER system contact us now!
Leave A Comment